Helpful video reference. The tutorial "Grid-Tied Sunsynk Inverter with Fogstar Batteries!" shows a real UK residential Sunsynk installation paired with Fogstar batteries, covering the AC and DC wiring sequence used by an MCS-accredited installer.
1. Check the consumer unit capacity
Open the consumer unit and count the spare ways. A Sunsynk 5 kW needs a dedicated 32A MCB or RCBO, so if the board is full you will need a piggyback module or a new board before the inverter goes in.
Check the main service fuse rating too. Most UK homes have an 80A or 100A fuse from the DNO. A solar system that generates up to 5 kW single-phase will typically fall under G98 (below 3.68 kW export) or G99 (above it). Confirm which applies before you start, because the paperwork and timescales are different. G98 is a simple notification after commissioning; G99 requires prior approval and can take weeks.
2. Mount the inverter
Sunsynk inverters are wall-mounted indoors. A garage or utility room is ideal: dry, ventilated, and away from living spaces. Fix the mounting bracket to a masonry or studwork wall that can take the weight (around 20 kg for a 5 kW unit).
Leave at least 300 mm clearance on each side and above the unit for airflow, as specified in the Sunsynk installation manual. Under BS 7671:2018+A4:2026, battery storage equipment must not be sited in loft spaces, under-stairs cupboards, hallways or escape routes, so plan the location carefully before drilling any fixings.
3. Connect the DC solar string inputs
Terminate the PV string cables with MC4 connectors if they are not already fitted. Use a proper MC4 crimp tool rather than pliers: a poor crimp can arc under DC load and cause a fire. Check polarity with a multimeter before connecting. The inverter's DC+ and DC– terminals are labelled, and reversing them will damage the unit.
Keep the string open-circuit voltage (VOC) within the inverter's rated input. For a Sunsynk 5 kW this is typically 420 V. Add up the VOC of all panels in the string at the lowest expected temperature (colder panels produce more voltage) and confirm it stays below the limit.
4. Wire the AC grid connection
Run 10 mm² twin-and-earth from the consumer unit to the inverter AC terminals. The cable must be installed on a dedicated 32A Type C MCB or RCBO - Type C is specified because the inverter's switching can trip a Type B breaker on start-up. Clip or conduit the cable along its full route and ensure it passes through any fire barriers correctly.
At the inverter, connect L (brown), N (blue) and PE (green-yellow) to the labelled AC terminals. Tighten to the torque specified in the manual, usually around 2 N·m. A loose terminal under AC load will overheat.
5. Connect the battery DC cables
If the installation includes a battery pack, connect the BMS communication cable first. The Sunsynk uses a CAN or RS485 protocol depending on the battery brand. Pylontech, Puredrive and several other BMS-protocol batteries are supported, but check the Sunsynk compatibility list before purchase because not every lithium battery will work.
Once the communication cable is in place, connect the DC power cables: positive first, then negative. Use the cross-sectional area specified for your battery capacity (typically 35 mm² or 50 mm² for a 5 kWh pack at this current level). Fit the DC fuse or isolator in the positive cable as close to the battery as practicable.
6. Fit the CT clamp and energy meter
The CT sensor is what tells the inverter whether the property is currently importing or exporting. Clip it around the live (brown) meter tail, between the electricity meter and the consumer unit. The arrow on the CT must point toward the consumer unit, not toward the meter. Getting this wrong means the inverter charges the battery when it should be exporting, and vice versa.
Some Sunsynk installations also use a separate Eastron energy meter for more accurate monitoring. If fitted, connect it to the inverter's RS485 meter port using screened twisted-pair cable.
7. Commission via the Sunsynk app and submit G98
Power up in a specific order: solar panels off (or DC isolator open), then switch the battery on, then apply AC from the consumer unit. The inverter will run through a self-test before connecting to the grid.
Open the Sunsynk Connect app and pair the inverter via the Wi-Fi dongle. Set the battery type (Pylontech, Puredrive, etc.), the grid export limit if required by the DNO, and any time-of-use charging schedule to suit your electricity tariff. Test that the system is exporting cleanly by switching on a large load and watching the display.
Finally, complete the G98 notification form and submit it to your local DNO. This is a legal requirement for any new generation system connecting to the grid. Keep a copy for the Electrical Installation Certificate.
When to call us
Hybrid inverter wiring is not a DIY job. It involves live DC strings, grid-connected AC, battery storage and Part P notification. Richard covers solar battery installations across east Kent, from the initial consumer unit assessment through to DNO notification and commissioning. If you are planning a Sunsynk system or have one that is not behaving as expected, get in touch.
Need a solar battery installer in east Kent?
Richard handles the full Sunsynk installation from consumer unit survey to G98 submission, covering Sandwich, Deal, Dover and the surrounding area.