Video reference. Adam Stears of SOTA Electrical, an OZEV-approved EV charger installer in Portsmouth, walks through a step-by-step Hydra Cubus installation in "Is This Goodbye To The Ohme?? CHEAPER & EASIER To Install." Adam covers the full install sequence and compares the Hydra Cubus to other chargers at a similar price point.
1. Assessing the consumer unit and supply
Your electrician's first job is to check whether the consumer unit can accommodate a new 32A circuit and whether the incoming supply has enough spare capacity for a 7.4 kW load.
Most modern consumer units have room for one or two additional circuits. If the board is full, the options are a consumer unit upgrade or a henley block arrangement, depending on the age and type of the existing installation. Your electrician will also measure the actual live load on the supply with a clamp meter during a busy time of day, since the theoretical maximum on the existing circuits often overstates the real peak draw.
Where the supply uses TN-C-S earthing (the most common arrangement in the UK, via the neutral conductor), the installation also needs Open PEN protection for the EV circuit. The Hydra Cubus datasheet specifies the earthing arrangements the unit is compatible with, and your electrician will confirm the approach during the survey.
2. Planning the cable route
The Hydra Cubus datasheet specifies 6 to 10 mm two-core and earth cable. The correct size within that range depends on the cable route length and how the cable is installed. For a 20-metre run in conduit on an external wall, 6 mm is typically fine. For a longer run, or for a run in an insulated wall where the cable cannot dissipate heat as easily, 10 mm may be needed to stay within the voltage drop limit.
Your electrician will calculate the appropriate cable size for the specific installation before ordering. For a detached garage, the underground section uses armoured SWA cable buried at a minimum of 450 mm with mechanical protection where it surfaces.
3. Fitting the RCBO in the consumer unit
The Hydra Cubus has a built-in leakage detector that covers both the DC component (6 mA Type B) and the AC component (30 mA) of fault current. This built-in protection is what allows the installation to be completed without a separate external RCD enclosure in the cable run, which simplifies the installation compared to chargers that require one.
Your electrician still fits a dedicated 32A Type B RCBO in the consumer unit for overcurrent protection. The RCBO also provides a local isolation point for the circuit. Where the board is a single-module type with no spare way, a tandem breaker or busbar extension may be needed, and the electrician will advise on the specific approach for your board make and model.
4. Running the supply cable
Once the RCBO is in place, the cable is drawn along the planned route and secured at regular intervals. On brick or masonry, cable clips or cleats keep the cable neat and in contact with the surface for thermal dissipation. Surface conduit on external walls is fixed to avoid movement over time, particularly in exposed coastal locations where wind and salt spray accelerate fixing corrosion.
Where the cable enters the charger from the bottom, there should be a slight drip loop in the cable just below the gland entry point so any water that runs down the cable does not follow it into the gland. This detail is easy to overlook and accounts for a number of field failures in exposed installations.
5. Mounting the Hydra Cubus on the wall
The Cubus is a compact unit that mounts directly to the wall or onto a wall bracket. Your electrician marks the fixing positions with a spirit level, drills and plugs the holes in masonry, and screws the unit into place. For a stud wall or hollow block, appropriate cavity fixings are used.
Getting the charger level at this stage matters both aesthetically and practically: a charger that is not plumb looks wrong from a distance, and on some units it can affect how well the front panel closes.
6. Connecting the wiring and setting up RFID access
With the charger on the wall and the cable trimmed to length, your electrician connects Line, Neutral and Earth to the correct terminals and tightens the cable gland to the specified torque. The gland seal is important for weatherproofing on an external installation.
The Hydra Cubus has a built-in RFID reader on the front panel. By default it may be set to open access, meaning any user can plug in and start a session. If you want to restrict charging to specific users, your electrician or the app setup process will programme the RFID cards or fobs during commissioning. This is a useful feature if the charger is visible from the road or if the property has multiple users who charge separately.
The tethered version comes with a 5 m Type 2 cable pre-fitted. The untethered socket version works with any car that uses a Type 2 connector and means you carry your own cable.
7. Commissioning via the Hydra Nexus Pro app
Restore power at the consumer unit and open the Hydra Nexus Pro app. The setup sequence connects the charger to your home Wi-Fi (or mobile data if the 4G model is installed), and from there you can:
- Set a charging schedule. Configure off-peak hours to match your energy tariff so the unit charges automatically at the cheapest overnight rate.
- Manage RFID access. Add, remove or audit the RFID cards and fobs associated with the charger.
- Connect to OCPP management. If you have a home energy management system that is OCPP 1.6 compatible, the Cubus can be integrated into it for coordinated solar self-consumption or demand management.
- Test session. Plug in and confirm the app shows the session starting at the correct rate and that a stop command works. Your electrician issues the Electrical Installation Certificate and submits the Part P notification on completion.
When to call us
Richard covers EV charger installations across east Kent. If you are considering a Hydra Cubus and want advice on whether the charger suits your property's supply and earthing arrangement, get in touch for a free survey.
EV charger installation in east Kent?
Richard installs home EV chargers with full certification, including the Hydra Cubus. Free quote for supply and fit in Sandwich and the surrounding area.
Contact Richard