Helpful video reference. We use an installation walkthrough by Niche Energy, an MCS-certified heat pump installer based in Mold, north Wales, as the video reference here. Their "16kW Samsung Air Source Heat Pump Installation" shows the full electrical and mechanical installation of a Samsung EHS and is a useful companion to the written installation manual.
1. Identify the Samsung EHS model and generation, and check the installation manual
The model number is printed on the outdoor unit nameplate, usually inside the service panel or on the casing. R290 Gen 7 Monobloc models follow the format AExxxRXYDEG; R32 Gen 6 split models use AExxxJXYDEH. The generation matters because the Gen 7 R290 models carry different RCBO and cable ratings from the earlier R32 generation.
Download the installation manual for your exact model reference from Samsung's professional HVAC support portal before starting any electrical work. The electrical data table in the manual is what you will work from throughout the job: it lists the rated current, the maximum overcurrent protective device rating, and the recommended cable cross-section for the supply circuit.
For split-system EHS models, also check whether the indoor hydrobox needs a separate supply circuit. Most do, so confirm with the heat pump installer's design before quoting the consumer unit work.
2. Fit a dedicated Type A RCBO in the consumer unit
Fit a Type A RCBO -- not Type AC -- in a spare way at the consumer unit. Samsung's Gen 7 R290 Monobloc manuals typically specify 16A for the 5 kW model, 25A for the 8 kW and 32A for the 12 kW and 16 kW single-phase models. Always confirm the rated current in your manual and size the RCBO to that figure: do not round up beyond what the manual permits.
Type AC RCBOs are not acceptable. The EHS Mono uses a variable-speed inverter drive that can produce a DC leakage component in a fault condition, which a Type AC device will not detect. Samsung specifies a Type A device as the minimum. Some installers fit a Type F where other inverter-drive loads such as an EV charger share the same installation.
Label the RCBO: "Heat Pump -- Samsung EHS [model]" so any future engineer can identify the circuit at a glance without having to trace the cable.
3. Run the supply cable to the outdoor unit
For a pure monobloc EHS model, the supply cable runs directly from the RCBO in the consumer unit to the outdoor unit terminal block. There is no indoor hydrobox requiring a separate mains circuit, which is one of the key differences from split-system ASHPs such as the Panasonic Aquarea K and L series.
Cable cross-section is determined by the rated current in the installation manual and the actual run length. Use the BS 7671 voltage drop tables to confirm the chosen cable keeps voltage drop within 3% at full load. For typical domestic runs, 4 mm² twin-and-earth covers most single-phase EHS Mono models at run lengths up to around 20-25 metres; check the calculation for longer routes.
All exposed cable must run in conduit or surface trunking. Any cable chased into plaster must follow a recognised cable zone (vertically above a socket or switch outlet) or be protected by metallic conduit. Where the route crosses a fire compartment wall, use fire-rated sleeves and seal both sides.
4. Fit the TPN outdoor isolator within sight of the outdoor unit
Mount a weatherproof TPN isolator (IP65 minimum; IP66 is preferable on exposed elevations) on the external wall within direct sight of the outdoor unit. The isolator must disconnect all poles including neutral and must be lockable in the off position.
The siting requirement is functional: a service engineer crouching at the outdoor unit must be able to see the isolator handle and confirm it is in the off position without leaving the work area. In practice, within 2-3 metres on the same wall face satisfies this in almost all domestic installations.
The cable from the indoor consumer unit terminates at the isolator's supply terminals. From the load terminals, run a short section of SWA or twin-and-earth in weatherproof conduit to the outdoor unit's electrical compartment.
5. Wire the outdoor unit terminal block following Samsung's wiring diagram
Open the EHS outdoor unit's electrical compartment. The main terminal block is labelled with the terminal identifiers shown in the installation manual -- typically L, N and earth, with a separate chassis earth terminal. Connect the conductors to the correct terminals and tighten to the torque settings specified in the manual. Samsung lists torque values for each terminal size; using a calibrated torque screwdriver prevents both under-tightened connections and cracked terminal housings.
Connect the earth conductor to the chassis earth terminal, which is separate from the terminal block earth on most Samsung EHS models. Both earth connections are required; do not omit the chassis earth.
For split-system EHS models, the interconnecting cable between the outdoor unit and the indoor hydrobox carries both power and control signals. Use the cable type specified by Samsung for this interconnection -- it is not a standard twin-and-earth.
6. Connect the MIM controller or smart gateway
The EHS Mono supports a wired MIM-B19N controller and the Wi-Fi smart gateway MIM-H04N for ThinQ smart control. The wired MIM-B19N connects to the low-voltage control terminals on the outdoor unit PCB; the Wi-Fi kit MIM-H04N plugs into the designated port on the indoor controller PCB (or outdoor unit PCB for monobloc models -- check the installation manual).
Control cables are not mains circuits and do not require the same protective installation as the supply cable, but keep them separated from mains cables throughout their route: at least 100 mm apart and not in the same trunking as the mains supply. Use screened cable if the run is long or passes parallel to mains wiring for more than a few metres.
ThinQ smart control requires the homeowner to create a Samsung account and register the heat pump in the ThinQ app before remote control becomes active. Confirm the Wi-Fi network is 2.4 GHz -- the MIM-H04N does not connect to 5 GHz networks.
7. Submit G98 notification to the DNO and issue the EIC
Once the heat pump installer has commissioned the system, submit the G98 self-notification form to the relevant DNO within 28 days of commissioning. G98 self-notification applies to single-phase heat pumps below 3.68 kW export and to most standard domestic installations. For three-phase models or systems that form part of a larger renewable energy installation, check whether G99 applies instead -- G99 requires DNO approval before commissioning rather than notification after.
Issue an Electrical Installation Certificate covering the new supply circuit. Hand both documents to the homeowner alongside the heat pump installer's commissioning certificate and the Samsung warranty registration confirmation.
When to call us
If you are based in east Kent and have a Samsung EHS being installed, Richard can handle the electrical supply side: RCBO, cable run, TPN outdoor isolator, MIM controller wiring, G98 notification and Part P certificate.
Samsung EHS installation in Sandwich or east Kent?
Richard handles the electrical supply: RCBO, cable run, TPN outdoor isolator, controller wiring, G98 notification and Part P certificate. Happy to co-ordinate with your Samsung MCS installer.
Contact Richard