The Mitsubishi Ecodan FTC7 is the flow temperature controller that sits at the heart of most current Ecodan installations. It manages the relationship between the outdoor heat pump, the cylinder unit, zone valves and any third-party room controls. Wiring the FTC7 is a separate job from the main 230V supply described in the companion article on wiring the Ecodan electrical supply; the FTC7 connections are mostly low-voltage and volt-free, with one important exception: the zone valves connected via the FTC7 output terminals do carry 230V. Work methodically through the DIP switches, then the inputs, then the outputs, before powering up.

Helpful video reference. We reference Mitsubishi Electric UK's official Ecodan FTC initial set-up guide as the video companion here. The Mitsubishi Electric Ecodan FTC initial set-up video from the official Ecodan YouTube channel covers the controller's first power-on sequence, which is useful context before wiring begins.

Before you start. Wiring the Mitsubishi Ecodan FTC7 involves a mix of volt-free low-voltage connections and 230V mains-voltage zone valve outputs. The zone valve and backup heater connections are notifiable under Part P. This guide is written for qualified electricians working alongside a Mitsubishi Ecodan heat pump installer; do not attempt this work unless you are competent in both mains electrical work and low-voltage control systems.

1. Identify the FTC7 location and choose the wiring option

The FTC7 is built into most Mitsubishi Ecodan cylinder units (pre-plumbed cylinders often have the FTC7 factory-wired into the unit). For configurations using a separate buffer vessel or a third-party cylinder, the FTC7 may be supplied as a standalone unit. Confirm the location with the heat pump installer before starting the electrical work.

Two wiring options exist. Wiring option 1 draws the FTC7's own power supply from the interconnecting cable between the outdoor unit and the cylinder unit -- no separate mains feed to the FTC7 is needed. Wiring option 2 provides the FTC7 with its own independent 230V supply and is needed in some system configurations. The choice is specified by the heat pump installer in the job sheet; do not choose one based on convenience, as it also determines the DIP switch settings.

Check whether the cylinder unit already has factory-wired FTC7 connections before adding any wiring -- connecting to pre-wired terminals will create a parallel circuit that can interfere with the system.

2. Set the DIP switches before connecting any wiring

SW6-1 must be set to ON for all R32 and R290 Ecodan outdoor units connected to the FTC7 controller (PAC-IF081B-E and PAC-IF082B-E). This is one of the most commonly missed settings on new Ecodan installations and will prevent commissioning if left at the default OFF position on current-generation units.

All other DIP switches remain at their default OFF position unless the installation manual or commissioning checklist for your specific cylinder and outdoor unit combination states otherwise. The commissioning checklist is a separate document from the installation manual -- obtain both from the heat pump installer before starting.

Set all DIP switches before applying power to the FTC7. Setting a DIP switch with the board live risks static damage and may require a service call to reset the controller.

3. Wire the volt-free heating inputs

The FTC7 accepts volt-free thermostat contacts on its input terminals. IN1 is used for a zone 1 room thermostat or zone controller; if a third-party volt-free thermostat is connected to IN1, SW2-1 must be set to ON in the service menu. IN6 is used for a zone 2 room thermostat or zone controller; SW3-1 must be ON if a third-party zone 2 control is connected to IN6.

All inputs to the FTC7 must be volt-free. The input terminals are designed to read a switch closure or relay contact, not a live voltage. Connecting 230V or any other voltage to these terminals will destroy the PCB and is not covered by warranty. Use a volt-free relay between the thermostat or building management system and the FTC7 input, or specify a Mitsubishi-compatible room thermostat with a volt-free output contact.

Keep control cable runs separated from mains cables throughout their route. Where the control cable run is long or passes parallel to mains wiring, use screened cable to prevent interference.

4. Connect zone valve outputs

The FTC7 zone valve output terminals carry 230V and must be treated as mains-voltage wiring. Connect the motor wire from each 2-port zone valve to the appropriate output terminal as shown in the FTC7 wiring diagram for your system type (S-plan, Y-plan or underfloor only).

Connect the valve end microswitch to the pump call terminal. This is the signal that tells the circulation pump to run; with the microswitch wired correctly, the pump only operates when at least one zone valve is fully open, which protects the pump from running against a closed system.

Zone valve wiring at the cylinder unit is Part P notifiable: treat it as mains electrical work, include it on the Electrical Installation Certificate and confirm dead before working on the terminals.

5. Connect the DHW cylinder thermostat and backup heater

The immersion heater backup heater connects to the FTC7 backup heater output terminals, which are a 230V switched output. Connect the immersion heater flex to these terminals following the FTC7 wiring diagram for your system type.

The DHW thermostat, if used for backup cut-out, connects to the cylinder thermostat input terminals on the FTC7. These are volt-free inputs: connect only the thermostat's dry contacts, not a live voltage. Some systems use the DHW thermostat to prevent overheating of the cylinder during the backup heater cycle; the thermostat temperature setting should match the system design.

Some pre-plumbed Ecodan cylinders have these connections factory-wired with clearly labelled cables inside the cylinder unit. Check the cylinder wiring label before adding any connections: duplicating a factory-wired connection will create a parallel circuit that may interfere with correct operation.

6. Install the MELCloud Wi-Fi adapter and optional wireless receiver

The MELCloud Wi-Fi adapter (MAC-567IF-E or a later model) plugs into the white connector labelled CN105 on the FTC7 PCB. The connector is keyed and can only be inserted one way. The wireless remote receiver (RC-E5 or similar) plugs into the red connector labelled CNRF. Both are low-voltage plug connections: no screwdriver or tools are needed, but handle them carefully to avoid bending the connector pins.

Both accessories must be fitted before first power-on if they are part of the installation. Fitting them after initial commissioning is possible but requires a controller reset, which delays handover.

MELCloud registration requires the homeowner to create a Mitsubishi Electric owner account and register the system using the serial number and installation code. Confirm the site has a 2.4 GHz Wi-Fi network available; the MAC-567IF-E does not connect to 5 GHz networks.

7. Commission the FTC7 and check all zones

Apply power to the FTC7 (via the interconnecting cable under wiring option 1, or via the independent supply under wiring option 2) and power up the main remote controller (PAR-WT50R or equivalent). Run the initial set-up wizard, confirming the system type, zone configuration and flow temperature target match the heat pump installer's design documentation.

Trigger a heating call on zone 1: the zone 1 valve should open, the pump call signal should activate the circulation pump, and the heat pump should start within a short delay. If zone 2 is fitted, test it independently and confirm it does not interfere with zone 1 operation.

Issue the Electrical Installation Certificate covering all new 230V wiring on the job: zone valve outputs, backup heater connection and, if wiring option 2 was used, the independent 230V supply to the FTC7. Hand the EIC to the homeowner alongside the heat pump installer's commissioning documentation.

Stop and call the heat pump installer if: the system type or zone configuration is not clearly defined in the job sheet; the cylinder unit already has factory-wired connections that differ from the diagram you are working from; any DIP switch setting in the installation manual is unclear; or the MELCloud registration fails and the heat pump will not commission.

When to call us

If you are in east Kent and need the FTC7 controls wired alongside an Ecodan installation, Richard can handle the low-voltage and mains controls wiring, working in parallel with your Mitsubishi Ecodan heat pump installer.