Installing an Aurora Seren EV charger: what the job involves

The Aurora Seren is a 7.4 kW home EV charger designed and developed in Britain by Aurora Lighting, a manufacturer with over 25 years in the domestic electrical trade. It is OZEV-approved, IP55 weatherproof, and built to be contractor-friendly with a backplate-first installation approach that makes wall fixing and cable routing straightforward. The installation is notifiable under Part P and must be carried out by a qualified electrician.

Video reference. Rick and Gordon from eFIXX, established UK electrical trade media, walk through the first Aurora Seren installation of 2024 at a customer's home in "EV Charger Installation UK - SEREN". The video covers the full install sequence including the backplate-first mounting method, cable routing and app commissioning specific to the Seren.

This is not a DIY job. An Aurora Seren installation involves a new 32A radial circuit from the consumer unit, which is notifiable work under Part P of the Building Regulations. It must be carried out by a qualified electrician registered with an approved competent person scheme such as NICEIC or NAPIT. The steps below describe what a professional installer will do so you understand the job before getting quotes.

1. Assessing the consumer unit and available supply

Before ordering the charger, your electrician will check two things: whether the consumer unit has a spare way for a new 32A RCBO, and whether the incoming supply has enough spare capacity.

Most modern consumer units have room for one or two additional circuits, but older six-way boards may already be full. If there is no spare way, the options are a consumer unit upgrade or a piggyback arrangement using a henley block, depending on the existing setup. Your electrician will also measure the actual load on the supply with a clamp meter during a busy time of day to confirm the headroom before connecting a 7.4 kW load.

Aurora's warranty requires that the unit is installed by a qualified electrician in accordance with BS 7671. If the installation does not follow the wiring regulations, the warranty is void regardless of the fault.

2. Planning the cable route

The Seren runs on 6 mm two-core and earth cable on a dedicated 32A circuit. The route planning covers the path from the consumer unit to the charger location, and the method of containment for each section.

Inside the house, cable can be chased into the wall or run in conduit if surface routing is acceptable. Outside, all cable on exposed surfaces should be in UV-stable conduit to protect against weathering. Where the cable passes through a wall, the entry point should be sealed against weather and cold draughts.

For a detached garage install, armoured SWA cable is used for the underground section, buried at a minimum depth of 450 mm and mechanically protected where it crosses a vehicle route. Your electrician will add a draw cord in the duct at this point in case the cable ever needs replacement.

3. Fitting the 32A Type B RCBO in the consumer unit

The Aurora Seren requires a dedicated 32A Type B RCBO (30 mA) in the consumer unit. The Type B rating matters specifically for EV chargers: the power electronics in a modern charger can produce a very small DC component in a fault current. A Type AC or Type A device cannot detect this DC component reliably and may trip at the wrong moment or, in some fault scenarios, not trip when it should. A Type B device covers both AC and DC fault currents.

Your electrician connects the new 6 mm cable to the RCBO, checks polarity and continuity, and labels the circuit at the board. Where the consumer unit has a consumer meter tails arrangement, the new circuit will be connected to the main busbar in the normal way.

4. Running the supply cable

Once the RCBO is in place, the cable is drawn along the planned route and secured at regular intervals as BS 7671 requires. On brick or masonry, cable clips or cleats spaced no more than 400 mm apart keep the cable against the surface. Surface conduit on external walls should be fixed to prevent wind movement over time.

Where the cable passes through the ceiling void or under floors, it should be positioned to avoid contact with other services and clear of any area where it could be mechanically damaged. If the route passes near a heat source such as a boiler flue, the installer will check the cable derating applies and upsize if necessary.

5. Mounting the backplate and preparing the entry

The Seren uses a backplate-first method: the wall plate is fixed to the wall before the charger body is attached. This separates the wall-fixing work from the wiring work, which makes the job easier, particularly on textured or uneven render.

Your electrician will mark the fixing positions with a spirit level, drill and plug the holes, and screw the backplate firmly to the wall. The cable enters through a gland at the base or rear of the unit depending on the route. Getting the backplate level and firmly fixed at this stage matters because the charger body clips onto it and any movement in the plate will affect the finished installation.

6. Connecting the wiring and fitting the charger body

With the backplate fixed and the cable trimmed to length, your electrician connects Line, Neutral and Earth to the correct terminals inside the charger. The Seren's terminals are designed to accommodate the 6 mm conductors comfortably, and the cable gland should be tightened to the torque specified in the installation guide.

Getting the gland torque right matters for the IP55 weatherproofing. The seal between the gland and the cable jacket is what keeps moisture out of the terminal enclosure. Under-tightening is the most common cause of charger faults in the first year of operation.

Once the wiring is complete, the charger body clips onto the backplate. A small integrated LED light on the unit helps locate the socket in poor light, which is a practical detail on a drive that is not lit at night.

7. Commissioning via the Seren Energy app

Restore power at the consumer unit and open the Seren Energy app on a smartphone. The setup sequence asks you to create an account, connect the charger to your Wi-Fi network, and confirm the unit's location and tariff details.

This job must be done by a qualified electrician. Part P notification is required for all new EV charger circuits. If you are eligible for the OZEV Electric Vehicle Chargepoint Grant, the work must be done by an OZEV-registered installer. Always request an Electrical Installation Certificate on completion and keep it with your property paperwork.

When to call us

Richard covers EV charger installations across east Kent. If you are considering an Aurora Seren and want advice on whether your consumer unit and supply are ready for a new 32A circuit, get in touch for a free assessment.

EV charger installation in east Kent?

Richard installs home EV chargers with full certification, including the Aurora Seren. Free quote for supply and fit in Sandwich and the surrounding area.

Contact Richard

Related pages