Installing a Sync Energy Link EV charger: what the job involves

The Sync Energy Link is a 7.4 kW home EV charger with one feature that sets it apart: it can be recessed into the wall so only the socket face is visible. The unit is just 37 mm deep when recessed, giving a finish that looks more like a wall socket than a charger box. It also has an integrated 30 mA Type A RCD and an Open PEN Detection Device, so no separate earth rod or external RCD enclosure is required. The installation itself is notifiable work under Part P of the Building Regulations and must be done by a qualified electrician.

Video reference. Adam Stears of SOTA Electrical, an OZEV-approved EV charger installer in Hampshire, looks at the Sync Energy Link in "No More Big Boxes: The UK's Sleekest EV Charger Unveiled". Adam covers the recessed mounting design, the installation process and his view on where the Link fits in the UK home charger market.

This is not a DIY job. A Sync Energy Link installation involves a new circuit from the consumer unit, which is notifiable work under Part P of the Building Regulations. It must be carried out by a qualified electrician. The steps below explain what a professional installer will do, so you understand the job before getting quotes.

1. Assessing the consumer unit and deciding on mounting method

The first conversation with your electrician will cover two things: whether the consumer unit can accommodate a new 32A circuit, and whether you want the charger surface-mounted on the wall or recessed into it.

Surface mounting is the quicker option: the unit goes straight onto the wall with four fixings. Recessed mounting takes more preparation because a back box or recess needs to be cut into the wall first, but the result is much cleaner. At just 37 mm deep, the recessed unit can sit in a standard wall recess with only the socket face visible. For a rendered or plastered wall on the side of a house, this can look like it was designed into the building rather than bolted on afterwards.

The consumer unit assessment follows the same pattern as any EV charger install: check there is a spare way for a 32A RCBO, and that the incoming service has enough spare capacity. Your electrician will measure the actual load with a clamp meter during peak use.

2. Preparing the mounting position

For a surface mount, the preparation is straightforward: mark fixing positions, check for hidden cables or pipes with a detector, and confirm the wall is solid enough to hold the unit under rain and frost.

For a recessed mount, your electrician (or a separate plasterer or dry-liner) needs to prepare a back box or recess at the right depth. The cable route runs inside the wall to the back of the unit, which keeps the front face completely clear. If you are planning a recessed install on an external rendered wall, discuss the wall make-up with your installer first to confirm the depth works without compromising insulation or weatherproofing.

3. Running the supply cable

The Link runs on 6 mm two-core and earth cable on a 32A circuit, the same as most 7.4 kW home chargers. For a surface-mounted install, the cable can run in surface conduit or through the wall. For a recessed install, the cable routes inside the wall so it is hidden before the unit is fitted.

For a detached garage or a driveway crossing, armoured SWA cable is used underground, buried at least 450 mm deep and mechanically protected where it crosses a vehicle route.

4. Fitting the RCBO in the consumer unit

The Link has an integrated 30 mA Type A RCD, so there is no need for a separate external RCD enclosure in the cable run between the consumer unit and the charger. This simplifies the install compared with chargers that require an external RCD. Your electrician connects the 6 mm circuit to a dedicated 32A Type B RCBO in the consumer unit and labels the circuit clearly.

The Link also has an integrated Open PEN Detection Device (OPDD) that meets IET01:2024, which means no separate earth rod is required at the charger location. This is useful for garage installations where earthing arrangements can otherwise be complicated.

5. Mounting the unit and making the final connections

For a surface mount, the charger screws directly to the wall. For a recessed install, it fits into the prepared back box. Your electrician connects Line, Neutral and Earth to the correct terminals, tightens the cable entry gland and secures the front face. The Link is IP55 rated, making it suitable for exposed external walls and open carports.

The tethered version comes with a 7.5 m Type 2 cable pre-fitted, which suits most parking arrangements and means you do not need to carry a separate cable. The untethered socket version works with any car that uses a Type 2 connector.

6. Commissioning via the Sync Energy app

Once power is restored, the unit is set up through the Sync Energy app:

The Wi-Fi/LAN model connects to your home network during commissioning. If the charger is in a garage with no Wi-Fi signal, the Link 4G model uses the mobile network instead.

This job must be done by a qualified electrician. Part P notification is required for all new circuits. If you qualify for the OZEV Electric Vehicle Chargepoint Grant, the work must be done by an OZEV-registered installer. Always request an Electrical Installation Certificate on completion.

When to call us

Richard covers EV charger installations across east Kent. If you are considering a Sync Energy Link and want advice on surface or recessed mounting for your wall type, or whether your supply and consumer unit are ready for a 7.4 kW circuit, get in touch for a free assessment.