What is involved in adding a second consumer unit

A second consumer unit, sometimes called a sub-board, is fitted when the main board is full and new circuits are needed, or when a garage, annex, or home workshop needs its own distribution board. It is notifiable work under Part P - this guide explains what a qualified electrician will do so you know what to expect and can ask the right questions.

Helpful video reference. The video above explains how to extend consumer units and add a second consumer unit in a UK domestic installation, covering the supply connection options and the earthing considerations. It gives a clear overview of what the job involves before you speak to an electrician.

This is notifiable work. Adding a second consumer unit is notifiable under Building Regulations Part P. It must be carried out by a registered electrician who can self-certify, or notified to your local authority building control before work starts. Do not attempt this yourself - the consequences of getting the earthing or cable sizing wrong are serious.

1. Why add a second consumer unit?

The most common reasons are: the main board is full with no spare ways; a house extension or converted loft needs several new circuits; a detached garage or outbuilding needs its own board; or the existing installation is TT (earth electrode) and a new part of the house has different earthing requirements.

Adding a second board inside the same building is straightforward. Running supply to a separate structure (garage, shed, summer house) involves additional considerations around earthing and cable burial depth - see the greenhouse supply guide and the outbuilding supply guide for those cases.

2. Assess the existing installation

Before anything else, your electrician will check the main consumer unit: how many spare ways, the rating of the main switch, and whether the earthing arrangement can support additional circuits. On a TN-C-S (PME) supply - the most common in the UK - the second board shares the main earthing terminal. On a TT supply, the earth electrode resistance needs measuring to confirm it is adequate for the increased load.

The DNO's meter and cutout fuse also limit the total load. If the main fuse is 60 A and the house already uses close to that, adding a second board for heavy circuits like an EV charger or workshop machines may require a DNO upgrade first.

3. Choose how to supply the second board

There are three common supply methods:

4. Size the supply cable correctly

The cable between the supply point and the second board is sized for the maximum demand of the new circuits under BS 7671 Appendix 4. The calculation takes into account grouping (if cables share containment), thermal insulation (if cables run through insulated cavities), and ambient temperature.

For a typical domestic sub-board serving sockets and lighting, 10 mm2 twin and earth is common. A board serving an EV charger, electric shower, or workshop equipment will need a larger cable. Getting this wrong is one of the most consequential errors in domestic installations - undersized cable overheats.

5. Choose the right type of second consumer unit

The 18th Edition of BS 7671 requires all circuits to have 30 mA RCD protection. A second consumer unit must comply, which means choosing between:

6. Earthing and bonding

The earthing conductor from the second board runs back to the main earthing terminal (MET) at the first board. It must be sized correctly: typically 10 mm2 for a board supplied by 10 mm2 or 16 mm2 cable. A separate earth electrode is not permitted for a sub-distribution board on a PME supply.

If there are any extraneous conductive parts in the area served by the second board (gas or water pipes, structural steelwork), supplementary bonding may be required.

7. Testing and certification

Once the installation is complete, full initial verification tests are carried out: insulation resistance on every circuit, earth fault loop impedance, RCD trip times, and polarity. The results are recorded on an Electrical Installation Certificate (EIC), which is the document that registers the notifiable work with your local authority through the electrician's scheme provider.

You should receive the EIC, keep it with your property deeds, and hand it to the next owner when you sell. Buyers' solicitors increasingly ask for it.

Stop and call an electrician if: your main board is full and you are tempted to double up on an existing MCB, the meter tails are already warm, there is no earth sleeving on conductors inside the existing board, or you are unsure what earthing system the property uses. Any of these are signs that the existing installation needs attention before a second board is added.

When to call us

Richard installs second consumer units across east Kent: in house extensions, garage conversions, home workshops, and annexes. He will assess the existing installation, calculate what is needed, carry out the work, test it fully, and issue the certificate. Call or message to discuss what you are planning.