Helpful video reference. An installer's UK tutorial "Boiling water tap install! (Quooker fusion tap)" shows the Quooker tank going in under a UK kitchen sink. Worth watching before you plan the cable route so you can see how the tank sits, where the flex enters, and how much space the sink base cabinet loses to the tank body.
1. Read the tank data plate first
Every boiling water tap uses a small insulated tank under the sink to keep water at about 108 °C under pressure. The tank plugs into a flex, and the flex enters a switched fused connection unit above the worktop. Before you buy anything, take the fitting instructions and note the tank wattage: Quooker's Pro3 sits around 2.4 kW, Fohen and Qettle broadly the same, InSinkErator similar. All of them are within a 13 A fused connection unit's rating with plenty of headroom.
2. Pick where the switched FCU goes
The switched FCU is the local isolator. It has to be reachable without opening the sink cabinet, so the homeowner can switch off if the tank ever leaks or needs draining. The usual place is on the tile splashback above the worktop, at socket-outlet height, no further than about 2 metres from the tap.
Do not put the FCU inside the sink cabinet. If the tank ever weeps, the water finds the FCU and you have created the fault you were trying to isolate for.
3. Spur off the ring final circuit
Take a 2.5 mm² twin-and-earth spur from the nearest kitchen ring socket. Only one unfused spur is permitted per socket on a ring final circuit under BS 7671, so pick a socket that has not already been spurred (an easy check: pop the faceplate and count the cables in the back box).
The spur cable feeds the supply (line) terminals of the FCU. Sleeve the earth conductor in green-and-yellow sleeving before it enters the terminal. Tighten to the manufacturer's torque setting (usually 1.2 to 2.0 Nm on a modern MK or Crabtree plate).
4. Drop into the sink cabinet
From the load (out) side of the FCU, run a length of 1.5 mm² 3-core heat-resistant flex down inside the wall (or through a hole in the worktop upstand) into the sink base cabinet. Keep the flex clipped, not hanging loose, and leave enough slack that the tank can be pulled forward for service.
Terminate the flex into the manufacturer's flying lead or terminal box. Most Quooker units are supplied with a pre-fitted 3-pin plug on the tank end, so many installers fit an unfused single socket inside the cabinet fed from the FCU and simply plug the tank in. Either approach is acceptable if the FCU above the worktop remains the accessible isolator.
5. Fit a 13 A fuse, not a 3 A
Fit a 13 A BS 1362 fuse in the FCU. This is the one point that catches installers out: a 3 A or 5 A fuse looks tidier for a small load, but the tank's cold-fill inrush current can trip a small fuse and, more importantly, every manufacturer's fitting instructions specify 13 A. Fit anything else and you can void the warranty on the tank.
Label the FCU faceplate ("Boiling water tap") with a printed circuit label so the next person to look at the kitchen knows what it isolates.
6. Test, energise, certify
With the circuit dead: continuity of ring (r1, rn, r2), insulation resistance between conductors, and polarity at the FCU. Energise, then check earth fault loop impedance (Zs) at the FCU load side and confirm the RCD or RCBO trips in under 40 ms at ×5 trip current.
Issue a Minor Works Certificate (for a spur off an existing circuit) or a full Electrical Installation Certificate (if the tap has been fed from a brand new dedicated circuit). Give a copy to the homeowner and keep one for the file.
When to call us
The plumber can do the water side, but the electrical connection needs to be right. Richard fits and certifies boiling water tap supplies for Quooker, Fohen, Qettle and InSinkErator taps across Sandwich and east Kent, including the switched FCU, the spur into the cabinet and the Minor Works Certificate for your records and the manufacturer's warranty.
Fitting a boiling water tap in Sandwich or east Kent?
Richard wires and certifies the electrical supply so your plumber can commission the tap the same day. Part P registered, fully insured.
Contact Richard