What is an Electrical Installation Certificate?

When an electrician installs a new circuit, replaces your consumer unit or wires up a new building, they must hand you an Electrical Installation Certificate. It is a more substantial document than a Minor Works Certificate and includes a full schedule of test results for every circuit. Here is what it contains and why you need to keep it.

Helpful video reference. John Ward (jwflame) covers UK electrical certification in detail. "Electrical Certificates Part 2 -- Installation Certificate" walks through the sections of the EIC form, explaining what each part means and what values to expect.

Before you read on. This guide explains the EIC document rather than the electrical work itself. If you have recently had a new circuit or consumer unit installed and did not receive a certificate, or you are preparing for a property sale and need to understand what paperwork should exist, read through and then call a qualified electrician to discuss your situation.

1. Understand when an EIC is needed instead of a Minor Works Certificate

An Electrical Installation Certificate covers new electrical work: a new circuit created from scratch, a new consumer unit, or a new installation in a new building or extension. The key word is "new". If the work adds to or modifies an existing circuit rather than creating something from scratch, a Minor Works Certificate is usually the correct form.

Jobs that require an EIC include:

If an electrician fits a new socket by adding a spur to your existing ring main, that is a Minor Works Certificate. If they run a dedicated radial circuit for a home office from the consumer unit, that is an EIC.

2. Check the front sheet

The front page of the EIC records:

All three signatures must be present. A certificate missing any of them is incomplete.

3. Read the Schedule of Inspections

The Schedule of Inspections is a visual checklist. The inspector ticks each item to confirm it has been checked and found satisfactory, or marks it "N/A" where it does not apply. The checklist covers:

If items are marked "not satisfactory", the certificate is unsatisfactory. The defect must be remedied before the installation is put into service.

4. Examine the Schedule of Test Results

This is the most technical part of the document and contains one row per circuit. For each circuit it records:

You do not need to understand all the numbers in detail -- what matters is that values are present for every circuit and that the electrician has signed off each one as satisfactory.

5. Note the next inspection date

Every EIC includes a recommended date for the next periodic inspection -- an EICR. For a domestic owner-occupied property the standard recommendation is ten years. For rental property it is five years (and the law in England now requires landlords to have a valid EICR). If the date on your certificate has passed, you are overdue an inspection.

6. File it permanently with the property

An EIC is the primary record that an electrical installation was designed, installed and tested to the relevant standard. It should be kept with the property's legal and building documents and passed on to new owners if you sell. Unlike planning permissions or building regulations completion certificates, it is not held centrally -- if you lose it, it cannot be reproduced.

If you have no certificate for new work. An electrician who carries out notifiable electrical work and fails to issue an EIC is not complying with Part P or BS 7671. If this has happened to you, contact the electrician first. If they will not remedy it, you can report the matter to your local building control authority. The practical fix before a sale is an EICR, which records the current condition even though it cannot replace the original installation records.

When to call us

Richard issues a correct EIC on every new circuit and consumer unit installation, including a full Schedule of Test Results for each circuit. If you have had a new circuit fitted and received no paperwork, or you are preparing to sell and need to understand what certificates should exist, call to talk through the options.